Hello, welcome to enterHenan AOKID New Material Technology Co., Ltd.Official website!

National Advisory Hotline

19139977929

Home > Product Center > Waterproof coating series
  • Cement-based waterproof coating AKD-331D
  • Cement-based waterproof coating AKD-331D

Cement-based waterproof coating AKD-331D

Product introduction:This product is a single component and dual -component new environmentally friendly waterproof coatings made of high -performance high -quality polymers and pure propylemal emulsion synthetic raw materials and inorganic powder.
Implementation standards:GB/T 23445-2009
Contact number:19139977929

Product Details

Product Features:


1. It can be constructed directly on the base surface of humid (no bright water) or dry materials, which is convenient for construction.


2. After coating, the rubber -like elastic waterproof layer is formed. The strength is large, the extension is good, and it has excellent adhesion, water resistance and low temperature.


3. It can be matched into various colors and has the effect of heat insulation and cooling.


    Reference dosage: 1.5 ~ 2.8kg/㎡.


Scope of application:


1. It is suitable for the waterproof, anti -seepage, and moisture -proof of buildings and structures such as new and old roofs, bathrooms, underground engineering, pools, cavities, tunnels and other buildings and buildings. It is especially suitable for waterproofing in the walls of grain depot and constant temperature workshop.


2. It can be used for adhesive tiles, polyethylene propinerium propeline composite waterproof rolls, etc. to improve the anti -penetration capacity.


Construction points:


1. You can select a single or dual component during construction. After opening the lid in a single component, stir well. Use the dual component to mix the powder into the liquid material. It becomes seamless overall elastic waterproof layer.


2. The grassroots requirements are required to be flat, clean, solid, and no water. For defects such as loose places, holes, and lack of corners, repairs with composite materials mixed with cement and sand. End end -end stitching seams and rigid base layer seams can be filled with composite coatings.


3. Grassroots treatment: dilute the composite coatings and about 40%of the water, stir well, and apply it.


4. Uniform and consistent requirements for painting. After each coating is scraped, it is necessary to wait for the coating to dry (1-4h) before the scraping can be coated. When scraping, if there is a bubble or pores, eliminate the defects in time and re -apply it.


Precautions:


1. After construction, the environmental temperature is easy to be 5-38 ° C, and it is not suitable for construction. Avoid rainwater when the coatings are not dried before the construction of the coating. Double -component coatings are mixed with proportion of powder. Powder should not be too large, otherwise the extension will be reduced. Before the coating is not dry, water is not allowed to be soaked with water.


     2. The coating after adding water should be completed within half an hour. After the construction is over, the container should be cleaned immediately.


3. If there is a normal phenomenon in the container, it does not affect the quality of the coating.


4. This product should be sealed and stored in a cool and cool place, with a shelf life for one year.


See more >>

Products Recommended

Links:

19139977929